ongrid_ecowas_2023

Date(s) (Revision)
Point of contact(s): Jafaru Abdulrhaman
Affiliation(s) 1 : ECREEE
ID
Abstract Location of settlements that could be connected to national electricity grids in 2023 according to the least-cost analysis conducted in the framework of the off-grid solar market assessment and private sector support facility design, which was done as an activity of the sub-component 1A of the Regional Off-Grid Electrification Project (ROGEP).
Keywords ongrid_ecowas_2023, electricity access, energy access, on-grid, electrification, rogep, utilities